Green Dream Blog

Mark Pipher

The Conclusion to my Slave Lake Adventure

August 28, 2013 2:38 pm Published by

I gave a farewell presentation to my coworkers illustrating the highlights of my summer, and figured; “heck, that would be a pretty good way to sign off.” So here are the highlights of my summer and the conclusion to both my blog and my summer internship…enjoy!

 

The Engineering Team

 


View Article   Leave your thoughts

Getting to Know My Coworkers

August 27, 2013 1:30 pm Published by

As my blog focuses on my experience at Slave Lake Pulp (SLP), I thought I would like to introduce some of my co-workers; their educational background, career history and current positions at SLP to help define the atmosphere at my workplace.  The diversity of personalities and experience make Slave Lake Pulp an excellent place to work and to learn.  So without further ado,


View Article   Leave your thoughts

Making Biogas at Slave Lake Pulp

July 31, 2013 1:20 pm Published by

Biomethanation with Power Generation Project 

My work at Slave Lake Pulp has been exclusive to the current biomethanation project at Slave Lake Pulp, and up to this point I have not talked much about the ins and outs of the project.  So here is a small project breakdown:

The scope of the $40 million biomethanation project currently underway at Slave Lake Pulp is quite substantial;


View Article   Leave your thoughts

This internship has been one of the best experiences of my life

July 5, 2013 10:47 am Published by

Safety is an integral part of both the operations and culture at all divisions of West Fraser Mills, and Slave Lake Pulp is no exception.  Slave Lake Pulp is committed to the principle that no phase of operation takes precedence over accident prevention.  To see evidence of this one has to look no further than the Health and Safety Philosophy that can be found plastered all throughout the mill:

 


View Article   Leave your thoughts

1 2

Show 5 - 15 - 25 results per page